Boreal Caribou Search Results
Resource
Authors
Terry Antoniuk, John Nishi, Rochelle Harding, Lynn McNeil, Karen Manuel
Resource Date:
March
2016
The Caribou Predator Fencing Pilot project (the Pilot) is a tool developed by Canada’s Oil Sands Innovation Alliance (COSIA) Land Environmental Priority Area (Land EPA) for caribou recovery. The...
Resource
This report provides the details of the construction and application of a set of population and harvest models for boreal caribou in two Wildlife Management Zones and six other areas of interest in...
News
Northwest Territories Environment and Natural Resources is requesting that hunters hand over caribou, moose, and white-tailed deer heads to facilitate monitoring for Chronic Wasting Disease. A $50...
Resource
Authors
Wetland Knowledge Exchange
Resource Date:
November
2023
Cassandra Chabot-Madlung, County of Grande Prairie presents - Wetland Replacement Program: How it Started & Who Can Participate This is a Municipal viewpoint of Alberta Environment and Protected Areas...
Resource
Resource Date:
September
2017
Rapid landscape alteration associated with human activity is currently challenging the evolved dynamical stability of many predator–prey systems by forcing species to behaviourally respond to novel...
Resource
Authors
Katherine Parker
Perry Barboza
Michael Gillingham
Resource Date:
January
2009
1. Nutrition influences most aspects of animal ecology: juvenile growth rates and adult mass gain, body condition, probability of pregnancy, over-winter survival, timing of parturition, and neonatal...
Resource
The ability of many species to adapt to the shifting environmental conditions associated with climate change will be a key determinant of their persistence in the coming decades. This is a challenge...
Resource
Authors
Mariano Feldman
Marc Mazerolle
Louis Imbeau
Nicole Fenton
As resource extraction moves north across the globe, wetland ecosystems in Canada are increasingly degraded because of disturbances associated with anthropic activities, including timber harvesting...
Resource
Oil sand overburden materials within Syncrude Lease No. 17 were sampled and analyzed with the intent of isolating mineral materials overlying lean oil sand which may be useful in reclamation
Resource
Authors
Hans Boerger
Mike MacKinnon
Bill Hunter
The Clark hot water process currently used for extracting bitumen from the Athabasca oil sands results in large volumes of clay fines containing small amounts of residual bitumen. One possible way of...
Resource
Authors
Keith Jones
David Forrest
While the Challenge Paper intended to focus on a few key aspects of the reclamation challenge for mining in the oil sands area, it ended up provoking a wide range of reactions
Resource
Commercial production of synthetic crude oil from the Athabasca Oil Sands began in 1967 in north-eastern Alberta. Suncor Inc., then known as Great Canadian Oil Sands Ltd., began the development of...
Resource
Authors
Techman Ltd.
Rheinbraun - Consulting GmbH
Provides comprehensive review of the technical problems facing future oil sands developments and suggests options helpful in formulating oil sands mining, tailings disposal and reclamation plans
Resource
Authors
Techman Ltd.
Rheinbraun - Consulting GmbH
A total of sixty-eight drawings show the mining, tailings disposal and reclamation of the twelve mine designs developed in the study (see Volume 1).
Resource
Authors
Techman Ltd.
Rheinbraun - Consulting GmbH
Yearly cost summaries for the 12 mine plans analyzed in the study (Volume 1) for 35 years. Activities in each mine are grouped into 6 cost centres, which are further divided into cost sub-centres.
Resource
The Oil Sands Research and Information Network (OSRIN) is a university-based, independent organization that compiles, interprets and analyses available knowledge about managing the environmental...
Resource
Authors
Oil Sands Research and Information Network
138 potential oil sands challenges, categorized based on a set of criteria and solutions to the most pressing ones. About 84% of the challenges identified were expected to occur in the next 5 years
Resource
Authors
Richard Johnson
P. Bork
E.A.D. Allen
W.H. James
L. Koverny
The experiments detailed in this report show that it was possible to increase the solids content of sludge to 50% solids by adding three parts sand (tailings sand) to one part sludge.
Resource
Treatment plots were established on the Syncrude mine site to test the effect of a variety of mixtures of peat, mineral overburden, and tailings sand on establishment of trees and shrubs
Resource
Research plots were constructed on the Syncrude mine site at Mildred Lake to test effect of thickness and quality of replaced soil over tailings sand on the performance of trees and shrubs