Search Results
Displaying:
61 - 80 of 178
Erosion Control Projects on the Alberta Oil Sands Pipeline
Resource
The Alberta Oil Sands Pipeline System (AOSPL) is a 435 km long, 559 mm diameter pipeline that transports the entire production of synthetic crude oil from the Syncrude Canada Inc. plant to the...
Erosion Monitoring on Mountain Foothills Waste Dumps
Resource
The erosion study was designed to examine the effects of the regraded configuration (i.e. slope angle, slope length), waste material characteristics, age since reclamation, amount of precipitation...
Establishment of Native Boreal Plant Species on Reclaimed Oil Sands Mining Disturbances
Resource
Current revegetation strategies for disturbed oil sands sites include values such as biodiversity and sustainability. As a result, a wide range of species are sought for inclusion in revegetation...
Establishment of Trees and Shrubs on Mined Land in the Grande Cache Area
Resource
The Terrain Sciences Department of the Alberta Research Council has been conducting a reclamation research program at the operations of Smoky River Coal Limited in the Grande Cache area since 1972...
Evaluation of Alternative Procedures and Equipment for Conserving Topsoil During Pipeline Construction in Western Canada
Resource
Topsoil conservation has become standard practice on pipeline construction in western Canada over the last 30 years. Pipeline contractors have used a variety of procedures and equipment with different...
Factors Affecting Alpine Grass Seed Germination in Relation to Their Potential use in Reclamation
Resource
Poa alpina L. seeds germinated best under darkness and 16/8 h cycles of 22/l5°C temperature while Agropyron latiglume L. seeds needed a 29/22°C regime and darkness for best germination. Rapid...
Factors Influencing the Native Species Invasion of a Reclaimed Subalpine Minesite Near Grande Cache, Alberta
Resource
Factors affecting native species invasion were studied on a subalpine minesite (Smoky River Coal Limited No. 8 Mine) in the vicinity of Grande Cache, Alberta. The site had been revegetated with...
Faro Mine Complex Revegetation Activities
Resource
In preparation for remediation and closure of the Faro Mine Complex (FMC), significant work has been completed to develop and test revegetation methods at the mine site. Development and implementation...
Field Assessment of Sulphide Oxidation Rates in Cold Environment: Case Study of Raglan Mine
Resource
In this field study conducted on Raglan Mine's tailings storage facility (TSF), tailings oxidation rates were characterized with the oxygen consumption (OC) method. Surface tailings unfrozen...
Field Measurement of Wind Erosion in Southern Alberta: Preliminary Results
Resource
During the 1980's, the impact of frequent droughts and consequent erosion of topsoil by the wind have become of increasing concern to the agricultural community of southern Alberta. This paper...
Fisheries Habitat Mitigation for the Oldman River Dam Project
Resource
The government of Alberta has set an objective of "no net loss of recreational fishing opportunities as a result of the Oldman River Dam project". In May of 1988, a further commitment was made by the...
Footprints: The Evolution of Land Conservation and Reclamation in Alberta
Resource
This book is written to help assess how effectively we have, or are, conserving our land base and providing the stewardship required to pass our legacy on to our progeny.
Galena Hill, Yukon, Ecosystem Mapping Project
Resource
The Galena Hill Ecosystem Map (GHEM) was initially developed to provide information about existing plant communities and their growth conditions to guide upcoming reclamation efforts at the historical...
Geomechanical Investigation of Post Reclamation Subsidence of Prairie Strip Mine Spoil
Resource
The post-reclamation subsidence of cast-back overburden is of interest to mining companies and regulatory agencies. Although subsidence may be of lesser concern than the prevention of soil degradation...
Groundwater Hydrologic Regimes Within Reclaimed Surface Coal Mined Landscapes in Alberta
Resource
Between 1979 and 1988, the Plains Hydrology and Reclamation Project (PHRP) investigated interactions of groundwater, soils, and geology and successful reclamation of surface coal mines in the plains...
Growth, Innovation and Constant Evolution: Alberta Chapter CLRA 2023 AGM and Conference
Event
Event Date and Time
February 22nd, 2023 at 5:00pm MST to February 24th, 2023 at 4:00pm MST
Edmonton, AB
Organization
The Alberta Chapter of the Canadian Land Reclamation Association (CLRA) will be hosting its Annual General Meeting (AGM) and Conference in Edmonton. Our theme this year is brought to you thanks to...
Herald Oilfield Service Reclamation Project
Resource
The Herald Reclamation Project began in the summer of 1989 and, to date, has involved clean up of a 2 acre oil spill, salvage of metal equipment used by a now defunct oil cleaning business, and proper...
Hybrid Poplars: The New Addition to Syncrude's Land Reclamation Species
Resource
Field survival and growth of three hybrid poplar varieties, Walker (Populus deltoides x Populus petrowskyana), Northwest (Populus deltoides x Populus balsamifera) and 38P38 (Populus balsamifera x...
Impact of Climate on Reclamation Success in the Foothills/Mountains Region of Alberta, Canada
Resource
The Alberta Research Council has conducted a reclamation research program near Grande Cache, Alberta in conjunction with the surface mining operations of Smoky River Coal Limited since 1972. Use of...