Search Results
Displaying:
1 - 20 of 24
BERA News Fall 2022
Resource
Understanding how birds respond to landscape disturbance is key to effective restoration. Two studies used non-invasive microphone arrays to determine the exact locations of singing individuals in the...
BERA News Spring 2022
Resource
Mounding is a common restoration technique designed to improve microsite conditions for planted seedlings in wetlands. There are a variety of strategies for constructing mounds, though, and how mounds...
Challenges to our Future Tree Seed Supply
Event
Event Date and Time
June 23rd, 2022 at 8:30am PST to June 27th, 2022 at 12:00am PST
Sidney, BC
Organization
Join the CFGA Tree Seed Working Group for a multi-day event, comprising of presentations, workshops and field tours. The purpose of this tree seed meeting is to address a key bottleneck in the highly...
Dissipation of Bromacil in Humic Luvic Gleysols in Northwestern Alberta
Resource
Dissipation of bromacil in Humic Luvic Gleysols amended with cow manure was evaluated at two sites in northwestern Alberta from 1984 to 1987
Effect of Pipeline Construction on Soil Compaction in Alberta
Resource
No clear relationships emerged between soil Orders, zones, or soil parent materials and the effect of pipeline construction on soil compaction. Soil moisture conditions appear to be more important.
Effect of Pipeline Construction on Soil Strengths of Soil Horizons in Alberta: 1990 Final Report
Resource
At each of the fifteen 1989 study areas and at each of the eight 1988 study areas soil strength was monitored using a cone penetrometer in 15 cm depth increments to a depth of 52.5 cm.
Impacts of Overstripping Topsoil on Native Rangelands in Southeastern Alberta: A Literature Review
Resource
Available information indicates that overstripping and subsequent replacement of topsoil can produce horizon characteristics similar to plow depth characteristics resulting from cultivation
Minimal Disturbance Pipeline Construction Procedures in Peatland Areas
Resource
TransCanada presents an account of pipeline construction methods implemented in the boreal regions of Alberta.
Pipeline Reclamation Techniques
Resource
Successful reclamation of a pipeline right-of-way is contingent upon the proper material handling procedure, especially for topsoil conservation. NOVA's practice of topsoil conservation is discussed...
Preliminary Caribou Habitat Restoration Plan for the Leismer to Kettle River Crossover Project
Resource
On September 20, 2012, NOVA Gas Transmission Ltd. (NGTL) received approval for the Leismer to Kettle River Crossover Project. Approximately 63 km of this pipeline will be constructed within the...
Quantifying Restoration Success via Natural Recovery in Forested Areas Following Pipeline Construction
Resource
This resource is available on an external database and may require a paid subscription to access it. It is included on the CCLM to support our goal of capturing and sharing the breadth of all...
Rangeland Revegetation Monitoring on Two Pipeline Rights-of-Way in Southern Alberta
Resource
Compare vegetative productivity, plant species composition and animal utilization on pipeline right-of-way to that of the adjacent native grassland. Field assessments were conducted over 4 years
Reclamation and Industry in Alberta Today and Tomorrow (1990s)
Resource
This paper provides the author's perspective on a series of questions posed by the symposium's Organizing Committee. The paper does not represent an endorsed industry wide collective response...
Soil Compaction: A Literature Review
Resource
Concerns about soil compaction on pipeline rights-of-way have increased with the introduction of heavier, more powerful construction equipment
The Boreal Ecosystem Recovery and Assessment (BERA)
Project
Organization:
The boreal region of Alberta contains extensive disturbances from natural resource extraction. Roads, well pads, seismic lines (petroleum-exploration corridors), forest-harvest areas, and other...
The Edge 2022 (BERA Systhesis)
Resource
The central goal of the Boreal Ecosystem Recovery and Assessment (BERA) program is to understand the effects of industrial disturbance on natural ecosystem dynamics, and to develop strategies for...
The Edge: The BERA Program 2024 Synthesis Report
Resource
The 2024 issue of The Edge summarizes the following key findings: Plan A better understanding of passive recovery trajectories will help guide restoration planning LiDAR is a powerful planning tool...
The Long-term Impact of Pipeline Construction on Solonetzic Mixed Prairie
Resource
Study concentrated on the well-documented 1981 right-of-way, and compared it to the oldest trench, installed in 1957, and to the undisturbed adjacent mixed prairie