Wetlands Knowledge Search Results
Resource
Authors
Gerry Wheeler
Herman Vaartnou
Powerline rights-of-way were surveyed throughout Alberta to find out what vegetation was growing on them and if reseeding was required. The Whitewood coal mine at Wabamun was surveyed
Resource
Authors
Gerry Wheeler
Herman Vaartnou
General survey of roadside vegetation done to see what species it consisted of. The results were then compared to the Department of Highways and Transport's records of seeding conducted from 1963-1972
Resource
Authors
Gerry Wheeler
Herman Vaartnou
In this report an attempt has been made to relate the vegetation to a group of soil factors as well as climate and to examine soil texture in more detail and effects on plant communities and species
Resource
Authors
Gerry Wheeler
Herman Vaartnou
Determine which native plant species might be useful in the revegetation of disturbed sites such as pipelines, cutlines and strip mining areas and collect seed for further studies
Resource
Authors
George LaRoi
Mike Ostafichuk
16 undisturbed, 5-ha, permanent plots dominated by Pinus banksiana (jack pine) were established along an impingement gradient of atmospheric emissions from oil sands processing plants
Resource
The trial was established on blended materials consisting of native sand, clayey overburden and peat. Nine native grasses and eight cultivated grass varieties were seeded in June of 1981
Resource
Authors
J.P. Verschuren
L. Wojtiw
Point measurements of maximum depth showed that over 50% of the rainstorms occur in June and July, with only a small percentage in April (5.6) and September (10. 1).
Resource
Authors
Ruth Errington
Ellen Macdonald
Natalka Melnycky
Jagtar Bhatti
Climate warming in the North could lead to lichen decline within critical woodland caribou habitat. We used repeat measurements of sixty-nine plots over ten years (2007–2008 and 2017–2018) to assess...
Resource
Authors
Chris Powter
Richard Dixon
Nicolas Mansuy
Based on 115 respondents, the survey highlights that the R&R economy in Alberta is robust, with 2 056 employees working at least part-time and 1 488 fulltime equivalent positions.
Resource
Authors
Matthew Elmes
Eric Kessel
Corey Wells
George Sutherland
Jonathan Price
Merrin Macrae
Richard Petrone
Resource Date:
January
2021
Removal and reclamation should be considered as a worthwhile venture for roads that extend through fens and are no longer in use.
Resource
Authors
Melanie Dickie
Geoff Sherman
Glenn Sutherland
Robert McNay
Michael Cody
Fragmentation of the boreal forest by linear features, including seismic lines, has destabilized predator–prey dynamics, resulting in the decline of woodland caribou (Rangifer tarandus caribou)...
Resource
Authors
C.S. Davis
P. Fellin
D. Stevens
S. Todd
K. Heidorn
Since the determination of the environmental impact of two major pollution sources on precipitation quality was a primary project objective, poor collection efficiencies did not satisfy the objective
Resource
Authors
Heather Tokay
Chris Powter
Bin Xu
Bonnie Drozdowski
Dean MacKenzie
Simone Levy
Need for clear direction on information required to support professional justification which describes why specific deficiencies will not have long term adverse environmental impacts and/or affect ELC
Resource
Authors
L.L. May
Carl Warner
C.A. Acton
Francis Salifu
Bruce Anderson
Wayne Tedder
Tree and shrub cover increased following reclamation, with shrub cover reaching a plateau after nine years. Traditional use species are present and those planted have remained
Resource
Authors
Bonnie Drozdowski
Anne Naeth
Sarah Wilkinson
Mine waste materials with potential for use in soil construction at a diamond mine in the Northwest Territories were evaluated to address physical and chemical limitations for plant establishment...
Resource
Objective to evaluate the streamflow, suspended sediment, lake level, and water quality networks in the AOSERP study area so as to provide the basis for continuation and/or redirection.
Resource
Authors
Wendy Sladen
Stephen Wolfe
Peter Morse
Resource Date:
February
2020
This resource is available on an external database and may require a paid subscription to access it. It is included on the CCLM to support our goal of capturing and sharing the breadth of all...
Resource
Authors
Russell Ecological Consultants
There were few significant differences among provenances for any of the native species. This suggests that genotypic differences were small among the populations tested.
Resource
Authors
Humaira Enayetullah
Laura Chasmer
Chris Hopkinson
Daniel Thompson
Danielle Cobbaert
Seismic lines are the dominant anthropogenic disturbance in the boreal forest of the Canadian province of Alberta, fragmenting over 1900 km 2 of peatland areas and accounting for more than 80% of all...
Resource
Authors
Chris Stockdale
Quinn Barber
Amit Saxena
Marc-Andre Parisien
Resource Date:
March
2019
We undertook a wildfire risk assessment across the Cold Lake caribou range where we used the Burn-P3 model to determine: a) burn probability; b) wildfire risk to restored seismic line areas; and c) the effectiveness of mitigation measures. The burn probability of the landscape was highly heterogeneous, and recent large burns and some waterbodies provided “shields” that reduced burn probability on their leeward sides.