Land Management Search Results
Resource
The revegetation program began in 1981 with the seeding of the construction site disturbance and has been ongoing every year. The main objectives of the revegetation program are: 1. Erosion Control...
Resource
Authors
Sam Takyi
Michael Rowell
Bill McGill
Marvin Nyborg
Field trial on an already vegetated area on the GCOS tailings pond dike, to determine responses of the already established vegetative cover to different fertility levels, and fate of added fertilizer
Resource
TransAlta Utilities has always believed that finding solutions to reclamation problems must identify the most economical and technically feasible methods. A range of research related programs have...
Resource
In 1976 methods and materials were used in the search for afforestation practices that will assist in the establishment of a self sustaining vegetation cover compatible with land use objectives
Resource
With respect to mine planning, reclamation should be recognized as an integral part of mining and therefore should be considered as one of the constraints in determining mining methods and overall...
Resource
Authors
Virgil Hawkes
Gillian Donald
A long-term plot network would allow the monitoring data to describe the ecological condition of the reclaimed lands and define appropriate management strategies for achieving revegetation goals
Resource
Reclamation of land disturbed during surface mining of coal in the plains region of Alberta has become an important issue in the last decade. This corresponds to the increasing concerns over...
Resource
Authors
Sandra Landsburg
Al Fedkenheuer
Recommendations for rehabilitation and reclamation of soils contaminated by bromacil include use of activated carbon, manure, wet- dry soil cycles, and plant seedlings to enhance adsorption, and plant
Resource
Authors
David Brand
Andy Etmanski
Reclamation of 1,362 hectare mine site; recent carnivore activity is one indication of the eventual return of a healthy, balanced and sustainable ecosystem to the reclaimed Gregg River mine site.
Resource
Cardinal River Coals, Ltd. is a joint coal mining venture owned 50% by Luscar, Ltd. and 50% by Consolidation Coal, Co. of Canada. The minesite is located approximately 40 kilometres south of Hinton...
Resource
Past and present reclamation operations for the Vesta Mine are reviewed. Descriptions of the early attempts at levelling, subsoil and topsoil salvage and replacement, and revegetation are given...
Resource
Authors
Terry Macyk
Martin Fung
Ron Pauls
Syncrude Canada Ltd. produces 200,000 barrels of synthetic crude oil per day from its oil sands surface mining operations located 50 km north of Fort McMurray, Alberta. The three major types of...
Resource
Authors
Terry Macyk
Vern Albush
O. Terry
In 1992 the Alberta Research Council initiated a reclamation study at the Smoky River Coal Limited No. 12 Mine South area located northwest of Grande Cache, Alberta. The objective of the research is...
Resource
Authors
Russell Ecological Consultants
Species performances were generally poor in the species adaptability trials at Cadomin. Contrastingly, most species performed reasonably well in the species adaptability trial at Mildred Lake
Resource
Seventy-eight reclamation practitioners from government, industry, consulting, academia, and the services sector gathered in Edmonton on March 6, 2024, to highlight and discuss specific issues facing...
Resource
Authors
Marie-Claude Roy
J. Kariyeva
Jim Herbers
Jim Schieck
Final recommendations to the development of a wetland monitoring program for the Oil Sands region of Alberta.
Resource
Tailings sand sites: fine root biomass decreased with depth and proximity to the textural interface. Overburden sites: fine root biomass decreased abruptly at the textural interface and EC increased
Resource
Authors
Meike Lemmer
Bin Xu
Maria Strack
Linne Rochefort
Resource Date:
April
2022
This resource is available on an external database and may require a paid subscription to access it. It is included on the CCLM to support our goal of capturing and sharing the breadth of all...
Resource
Authors
Curtis Brinker
Rick Ferster
The Coal Valley Mine, approved in 1976, was the first Alberta mine with a prescribed post-disturbance forest end land use. At that time, unlike reclamation of mined lands on an agricultural land base...
Resource
Authors
Tim Adamson
Eric Beresford
The Obed Marsh Thermal Coal Project is located some 24 km N.E. of Hinton and is within the Forest Management Area administered by St. Regis (Alberta) Ltd. A commitment by Union Oil Company of Canada...