Land Management Search Results
Resource
Authors
Alberta Biodiversity Monitoring Institute
Resource Date:
January
2020
Linear features, including seismic lines, pipelines, transmission lines, roads, railways, and trails are pervasive in Alberta’s boreal forest and have been implicated as a primary factor leading to...
Resource
Authors
Drake Hocking
William MacDonald
The Workshop covered all active research and development projects for reclamation of land disturbances in Alberta. Purpose was to provide communication and discussion of current programs and results
Resource
Authors
Al Fedkenheuer
S.J. Brown
The extraction of bitumen from the Athabasca Oil Sands can be considered successful only if workable and economically feasible methods of reclamation of the area following mining are developed
Resource
Authors
Paul Ziemkiewicz
Con Dermott
Percy Sims
The workshop recorded in these proceedings was organized as the first step in developing a Native Shrub Research Program for reclamation.
Resource
Given the extensive experience of workshop participants, it was surprising to see how little confidence they had in using only their knowledge and experience to make reclamation certification decision
Project
Project Forest is a non-profit focused on rewilding local landscapes to capture carbon naturally. Made up of a team of passionate changemakers, they’re creating a community of companies working...
Resource
Purpose was: to obtain information on propagation of certain native and exotic woody plants; synthesize the information at the species level by method of propagation; and recommend further studies
Resource
Authors
Clive Welham
Nicole Robinson
Report describes a comprehensive, meaningful and cost-effective list of indicators of forest ecosystem function, including a description of how they might be used to assess reclamation success
Resource
Where forest floor was protected from disturbance, there were approximately 10 times as many aspen sprouts that were at least 3 times as tall as sprouts in the area where floor was stripped & replaced
Resource
Authors
Anne McIntosh
Bonnie Drozdowski
Dani Degenhardt
Chris Powter
Christina Small
John Begg
Dan Farr
Arnold Janz
Randi Lupardus
Delinda Ryerson
Jim Schieck
Scientifically robust monitoring protocol to enable consistent assessment of ecological recovery of physical, chemical, and biological indicators at certified reclaimed well pads on grasslands.
Project
In general, regulators expect that disturbed sites in the boreal forest will undergo complete reclamation (recontouring, soil replacement and revegetation) with the goal of returning the site to pre...
Resource
Authors
Brittany Flemming
Vincent Futoransky
Wade Pruett
This resource is available on an external database and may require a paid subscription to access it. It is included on the CCLM to support our goal of capturing and sharing the breadth of all...
Resource
Authors
Anne Naeth
Albert Lees
Jeanie Bietz
B.D. Irving
Al Fedkenheuer
Compare vegetative productivity, plant species composition and animal utilization on pipeline right-of-way to that of the adjacent native grassland. Field assessments were conducted over 4 years
Resource
This study tested the ability of rat root to grow in a high pH/high salinity environment, similar to that of a constructed oil sands tailings pond wetland.
Resource
This report summarizes up to 39 years of plant community development trends on Syncrude’s reclaimed mine sites near Fort McMurray, Alberta.
Resource
Authors
Earle Anderson
K. Cantrell
Gerry Genovese
B. Novlesky
A. Stemberger
Syncrude Canada Ltd. (Mildred Lake Project) is an oil sand surface mining and processing venture situated in the Athabasca Oil Sands of northeastern Alberta . This project, approximately 420 km north...
Resource
Ineffective surface reclamation legislation for many years left thousands of hectares of Alberta landscape scarred and abandoned after being disturbed by man's activities. In an effort to reclaim some...
Resource
Reclamation activities of the Alberta Forest Service fall into three general areas. It is involved in the process of application, approval, and inspection of all operations relating to resource...
Resource
The revegetation program began in 1981 with the seeding of the construction site disturbance and has been ongoing every year. The main objectives of the revegetation program are: 1. Erosion Control...
Resource
The site-specific data gathered throughout the life cycle of an upstream facility provides the basis for the integrated environmental management principles commonly applied for the reclamation of...