Land Management Search Results
Resource
Provide a preliminary understanding of the state of the art of in situ bitumen recovery technology, the most probable application and rate of application of that technology to the Athabasca deposit
Resource
Prior to implementing a large scale reclamation program, the goals must be defined to develop an effective plan of action. This focuses the efforts expended on the program and gives direction to the...
Resource
As an overview to pipelining in Alberta, prior to 1976 there was no requirement for operators to conserve topsoil or ensure growth capability. However, with the passing of Alberta Regulation 207/76...
Resource
Syncrude Canada Ltd. is an oil sands surface mining and processing venture located at the Athabasca Oil Sands deposit in northeastem Alberta. The, Alberta Government maintains that mined land be...
Resource
Authors
Karine Pigeon
Megan Hornseth
Doug MacNearney
Laura Finnegan
We used GPS data from caribou and wolves, field data on human and wildlife use of seismic lines and pipelines, vegetation heights extracted from LiDAR, non-invasive fecal DNA collections, and a suite...
Resource
Fur value produced per square kilometre averaged $7.58 ($19.64/mi2) but ranged more than 500-fold, with much variation seeming attributable to trapper effort. 5% of traplines reported nil catches
Resource
Linear disturbances such as powerline rights of way, seismic lines and roads are common in areas of intensive resource development. Roads that bisect wetlands can alter their hydrologic connectivity...
Resource
Authors
Terry Antoniuk
John Nishi
Karen Manuel
Mika Sutherland
Cornel Yarmoloy
In order to evaluate management options that may recover and sustain boreal caribou in the Athabasca Landscape area, the ALT developed scenarios and used simulation modeling to compare and evaluate...
Resource
Report focuses on evolution and current state of pertinent federal legislative Acts in the environmental, natural resource, and energy policy sectors that may impact oil sands environmental management
Resource
purpose of this project is to determine the population size of moose in the survey area with regard given to sex and age ratios and distribution according to habitat and seasonal climatic features
Resource
Authors
Leila Taheriazad
Carlos Portillo-Quintero
Arturo Sanchez-Azofeifa
This report presents a comprehensive review of industrial applications of an emerging environmental monitoring technology called Wireless Sensor Networks (WSN) and a WSN installed at Coal Valley Mine
Resource
Authors
Jeffrey Green
Gail Harrison
The costs and methods of wildlife habitat reclamation are discussed for three examples. The first example, the Cascade Landfill site in Banff National Park, illustrates the approach and costs of...
Resource
Several insect species and groups of insects are examined for their potential as biological indicators in the AOSERP area.
Resource
The epilithic microbial and micro-invertebrate communities under conditions of light and shade were studied from April to November 1978
Resource
Authors
Aaron Sekerak
Gordon Walder
16-24 species of fish were found in each watershed. Forage fish (lake chub, pearl dace, longnose dace, trout-perch, brook stickleback, slimy sculpin) and white and longnose suckers were most abundant
Resource
Authors
Aaron Sekerak
Gordon Walder
Maps showing fish collection locations, photos and details of the physical characteristics of nine streams within five watersheds (Firebag, Muskeg, Steepbank, MacKay, and Ells) in AOSERP study area
Resource
Authors
Hal Hamilton
Ron Wallace
D. Westlake
Julia Foght
Barry Taylor
Steve Hrudey
Relationship between hydrocarbons present naturally, or introduced due to surface oil sands mining and upgrading activities, and their potential bioaccumulation and tainting of the commercial fishery
Resource
During 1978, a number of aquatic projects were funded by AOSERP using a habitat inventory and mapping approach.
Resource
Authors
T.W. Chamberlin
E.A. Harding
Philosophy and structure of aquatic system inventory as conducted by the BC Resource Analysis Branch. Additional topics included data management and examples of detailed interpretive projects
Resource
Authors
Mary Gamberg
Jeremy Brammer
This is a report that covers all of the results from a project to monitor contaminants in caribou. Some tests could not be done due to lack of lab capacity during the pandemic. The report concludes...